The hotel was built in 1982, the last reconstruction was carried out in 2019.
Consists of a main 4-storey building with an elevator and an additional 4-storey building. There are 123 rooms in total.
Credit cards accepted: Visa, MasterCard.
Please observe dress code in the evening.
Location Cnic Gemini Hotel
Hotel type: Beach hotel
- Third line: 50 m
Infrastructure
Room types
promotional room
standard room inland view/Limited Sea View
family room eco
Suite